From Reactive to Planned
Learn how to use asset data, condition monitoring, and CMMSComputerized Maintenance Management System/EAM history to improve maintenance planningDetermination of resources needed and the development of anticipated actions necessary to perform a scheduled major job. An orderly appraisal and guarantee of all the prerequisites necessary to ensure completion of a given job at a predetermined time. It covers availability of ordered equipment, stores, materials, production, shutdowns, sketches, prints, specifications, etc., prioritize risk, and reduce reactive work.
Webinar Series
Move Maintenance Planning Closer to Real Asset Conditions
Digital twins do not have to be massive transformation projects. Watch this session to learn how maintenance teams can use existing asset data, condition monitoring, CMMSComputerized Maintenance Management System/EAM history, and operating contextCircumstances in which a physical asset or system is expected to operate. to improve planningDetermination of resources needed and the development of anticipated actions necessary to perform a scheduled major job. An orderly appraisal and guarantee of all the prerequisites necessary to ensure completion of a given job at a predetermined time. It covers availability of ordered equipment, stores, materials, production, shutdowns, sketches, prints, specifications, etc. accuracy, prioritize work by risk, and reduce reactive maintenanceMaintenance that takes place as a result of an equipment failure, imminent threat of failure or equipment performance issue..
Go back to Part 1: how stronger RCA helps eliminate recurring downtime